Refinery System Process Analysis and Testing using Agent-Based Simulation
Tickets
Registrations are closed
Refinery System Process Analysis and Testing using Agent-Based Simulation
Refinery System Process Analysis and Testing using Agent-Based Simulation
18 -
23
Aug
2024
Kuala Lumpur,
Malaysia
What are the Goals?
At the end of this Refinery Shutdown & Turnaround training course, you will learn to:
- Understand the Failure mechanisms of the Refinery applying API 571
- Size the necessary work for Assets life maximization using API 579
- Apply the correct type of turnaround for each asset
- Schedule work activities
- Control time, budget and scope during the shutdown
- Assess the performance of the Turnaround
Who is this Training Course for?
It is highly recommended that Refinery maintenance, reliability, engineering and technical support staff including leadership and management to attend this Maintenance Engineering training course. Also, including:
- Planners
- Supervisors
- Engineers
- Reliability Engineers
- Maintenance Team Leaders and Managers
- Operations Team Leaders and Managers
Daily Agenda
Day One: Refinery Shutdown Types & Asset Pairing
- Definitions of Shutdown, Turnaround
- Material failure and degradation in Refinery using API 579
- Refinery structure and units sensitivity to failure
- Failure rate mathematics the basis of Reliability center maintenance
- Shutdown and the life cycle of Refineries
Day Two: Shutdown & Turnaround Planning
- Refinery Work Order system (WO) input for Planning
- Size of work using API 579 and create Work Breakdown Structure (WBs)
- Creating the most appropriate organization structure to run the shutdown
- Spare parts and materials required for the shutdown
- Personnel internal or subcontractors required for shutdown
Day Three: Organizing the Shutdown Time Sequencing
- Work sequencing optimization
- Material –personnel- contractors’ constraints
- Fitting the optimum number of shutdowns in the life cycle of Plants
- Utilization of timing techniques (CPM-PERT)
Day Four: Control of Shutdown Time, Costs & Work Quality
- Gantt charts for keeping in time
- S- curve usage for budget monitoring
- Financial reserves for uncertainties
- ISO/API standards for work handover
Day Five: Shutdown Performance Analysis & Turnaround Efficiency Measurement
- Asset Turnaround Performance Indicators
- Shutdown Workload Performance Indicators
- Shutdown Planning Performance Indicators
- Turnaround Effectiveness and cost Performance Indicators
- Shutdown and Turnaround data archiving and future recommendations
Tickets
Registrations are closed
Related Cources
Civil Engineering for Non-Civil Engineers
24 -
28
Nov
2024
Cairo,
Egypt
Operation, Diagnostics and Maintenance of Equipment for Oil & Gas Production
24 -
28
Nov
2024
Kuala Lumpur,
Malaysia
Maintenance of Gas Compressors
24 -
28
Nov
2024
Istanbul,
Turkey
Hazards, Technology, Operation, and Economics for LNG
24 -
28
Nov
2024
Cairo,
Egypt
Hydrocarbon Fiscal Flow Metering
24 -
28
Nov
2024
Barcelona,
Spain
The Chemical & Petrochemicals Industry for Non-Technical Personnel
24 -
28
Nov
2024
Cairo,
Egypt
The Olefins and Polyolefins Business, Markets and Technologies
24 -
28
Nov
2024
Barcelona,
Spain
Storage Tank Design, Construction & Maintenance
24 -
28
Nov
2024
Istanbul,
Turkey
Surface Equipment Facilities
24 -
28
Nov
2024
Cairo,
Egypt
Well, Reservoir and Facility Management
24 -
28
Nov
2024
Barcelona,
Spain