Best Practices in Surface Production Operations Management
Tickets
Registrations are closed
Best Practices in Surface Production Operations Management
Best Practices in Surface Production Operations Management
08 -
12
Dec
2024
Kuala Lumpur,
Malaysia
What are the Goals?
The goal of this course will focus on the following objectives:
- Understand the challenges associated with production operations management
- Highlight best practice in metering, deferment administration and planning
- Generate strategy to meet the business-driver in an asset using case study
- Provide appropriate improvement process
By the end of this training course, you will learn to:
- Manage an operating asset with best-in-class practice initiative
- Understand the best management approach peculiar to your asset
- Recognize what to watch for in production operations practice
- Develop asset-specific integrated production plan
- Develop asset specific metering and deferment framework
Who is this Training Course for?
This training course is suitable to a wide range of professionals but will greatly benefit:
- Production Operators
- Field Production Personnel / Supervisors / Superintendents
- Production Engineers
- Asset Managers and Senior Managers
- Asset Support Engineers
- Process Engineers
- Reservoir Engineers
- Planning Engineers
- Production Accountants/Engineers
Daily Agenda
Day One: Overview of Surface Production Operations
- Introduction to Surface Production Operations
- Tools Supporting Operations Management
- Overview of Well, Reservoir & Facility Management (WRFM) process
- Metering Systems
- Operations Integration
Day Two: Production Deferment Administration
- General Principles of Deferment Administration
- Measurements
- Deferment Coding
- Roles & Responsibilities
- HCA Applications
Day Three: Production Allocation & Reconciliation
- Principles of Production Allocation & Reconciliation
- Domain Experts & Required Technology
- Populating and verification/validating process of data
- Allocation & Reconciliation
- Standard HCA Business Workflow
Day Four: Integrated Production/Injection Planning
- General Principles of Activity Planning
- Overview of Water-Injection System
- Business Objective for Integrated Production Planning
- Common Tools Required
- Challenges in Integrated Production Plan
- Integrated Production Plan Workflow
- Strategy in Generating Robust Plan linked to the Business
Day Five: Performance Review
- Case Study
- General Course Review
- Assessment of Participants
- Feedback
- Closing Remarks
Tickets
Registrations are closed
Related Cources
Crisis Management and Safety in Petroleum Installations
23 -
27
Dec
2024
Dubai,
United Arab Emirates
Digital Transformation in Corporate Training
23 -
27
Dec
2024
South Korea,
South Korea
Surface Equipment Facilities
29 -
02
Dec
2024
Dubai,
United Arab Emirates
Dynamics of Petroleum Depot Operations
29 -
02
Dec
2024
London,
United Kingdom
FLNG Operation & Maintenance (Floating Liquefied Natural Gas)
29 -
02
Dec
2024
Kuala Lumpur,
Malaysia
Commercial Oil Operations and Logistics
29 -
02
Dec
2024
Istanbul,
Turkey
Drilling Essentials for Non-Drilling Professionals
29 -
02
Dec
2024
Madrid,
Spain
Drilling Fluids Technology
29 -
02
Dec
2024
Istanbul,
Turkey
Drilling Optimization
29 -
02
Dec
2024
Cairo,
Egypt
Drilling Rig Inspection
29 -
02
Dec
2024
Barcelona,
Spain