Refinery Shutdown & Turnaround
Tickets
Refinery Shutdown & Turnaround
Refinery Shutdown & Turnaround
22 -
26
Dec
2024
Kuala Lumpur,
Malaysia
What are the Goals?
At the end of this Refinery Shutdown & Turnaround training course, you will learn to:
- Understand the Failure mechanisms of the Refinery applying API 571
- Size the necessary work for Assets life maximization using API 579
- Apply the correct type of turnaround for each asset
- Schedule work activities
- Control time, budget and scope during the shutdown
- Assess the performance of the Turnaround
Who is this Training Course for?
It is highly recommended that Refinery maintenance, reliability, engineering and technical support staff including leadership and management to attend this Maintenance Engineering training course. Also, including:
- Planners
- Supervisors
- Engineers
- Reliability Engineers
- Maintenance Team Leaders and Managers
- Operations Team Leaders and Managers
Daily Agenda
Day One: Refinery Shutdown Types & Asset Pairing
- Definitions of Shutdown, Turnaround
- Material failure and degradation in Refinery using API 579
- Refinery structure and units sensitivity to failure
- Failure rate mathematics the basis of Reliability center maintenance
- Shutdown and the life cycle of Refineries
Day Two: Shutdown & Turnaround Planning
- Refinery Work Order system (WO) input for Planning
- Size of work using API 579 and create Work Breakdown Structure (WBs)
- Creating the most appropriate organization structure to run the shutdown
- Spare parts and materials required for the shutdown
- Personnel internal or subcontractors required for shutdown
Day Three: Organizing the Shutdown Time Sequencing
- Work sequencing optimization
- Material –personnel- contractors’ constraints
- Fitting the optimum number of shutdowns in the life cycle of Plants
- Utilization of timing techniques (CPM-PERT)
Day Four: Control of Shutdown Time, Costs & Work Quality
- Gantt charts for keeping in time
- S- curve usage for budget monitoring
- Financial reserves for uncertainties
- ISO/API standards for work handover
Day Five: Shutdown Performance Analysis & Turnaround Efficiency Measurement
- Asset Turnaround Performance Indicators
- Shutdown Workload Performance Indicators
- Shutdown Planning Performance Indicators
- Turnaround Effectiveness and cost Performance Indicators
- Shutdown and Turnaround data archiving and future recommendations
Tickets
Related Cources
Effective Contractor Management in Maintenance & Technical Projects
23 -
27
Jun
2024
Barcelona,
Spain
Effective Contractor Management in Maintenance & Technical Projects
23 -
27
Jun
2024
London,
United Kingdom
Petrochemical Industry Fundamentals
23 -
27
Jun
2024
London,
United Kingdom
Petrochemical Price Forecasting Techniques
23 -
27
Jun
2024
Kuala Lumpur,
Malaysia
Integrated Field Development Planning
23 -
27
Jun
2024
London,
United Kingdom
Hydrocarbon Fiscal Flow Metering
23 -
27
Jun
2024
London,
United Kingdom
Introduction to Production Engineering
23 -
27
Jun
2024
Kuala Lumpur,
Malaysia
Laboratory Analysis for Oil and Gas Production
23 -
27
Jun
2024
Dubai,
United Arab Emirates
Oil Water Treatment Technology
23 -
27
Jun
2024
Kuala Lumpur,
Malaysia
Optimization of Oil and Gas Facilities Design and Operations
23 -
27
Jun
2024
Dubai,
United Arab Emirates