Petroleum Coke Manufacturing & Delayed Coker

التذاكر

تم إغلاق التسجيلات

Petroleum Coke Manufacturing & Delayed Coker

Petroleum Coke Manufacturing & Delayed Coker
27 - 31 أكتوبر 2024
Istanbul, تركيا
تركيا

What are the Goals?

By the end of this Petroleum Coke Manufacturing & Delayed Coker training course, the participants will be able to:

  • Conduct online spalling and predict its time
  • Deal with coke drum cycle troubles like unheading valve problems
  • React with delayed coker emergency situation especially with incomplete drum cycle
  • Obtain the basic knowledge of the petroleum coke manufacturing methods
  • Explain the pet coke production technologies
  • Learn the safety of delayed coking
  • Understand the product market trends and future
  • Introduce the environmental issue of the petroleum coke

Who is this Training Course for?

This Petroleum Coke Manufacturing & Delayed Coker training course is suitable to a wide range of professionals but will greatly benefit:

  • Refinery and Petrochemical Plant Managers
  • Process Engineers and Technologists
  • Operations Personnel including Shift Supervisors
  • Other Engineers who would like to have a further understanding of pet coke manufacturing technology

Daily Agenda

Day One: Overview About Delayed Coking Technologies 

  • Crude Oil Chemistry
  • Role of the delayed coker in the modern refinery
    • Typical Coking Refinery Flow Scheme
    • Refinery Complexity
    • Impact of a Coker
  • Feedstock considerations
    • CCR %
    • Asplatne
    • Distillation D86, D1160
  • Delayed coking
    • Licensors
    • Delayed Coking
    • Flexicoking
  • Safety and Storage
  • Petroleum coke category analysis and hazard characterization

 Day Two: Coke Drum Cycle Time Optimization

  • Troubleshooting of switch valve problems
  • Optimisation of steam out
  • Water quencing and sludge injection
  • Coke cutting methodology
  • Trpubleshooting of top and bottom inheading valve
  • Jet pump performace monitoring
  • Coke drum warm up for better life time

Day Three: Troubleshooting of Delayed Coker

  • Estimation of online spalling optimum time
  • Typical spalling chart
  • Common problems during spalling steps
  • Steam air decoking
  • Coke drum overhead line cleaning and its effect in yield optimization
  • Incomplete coke drum

Day Four: Petroleum Coke - Use and Environmental Issues

  • Industry and environmental issues
  • Usage and application of petroleum coke
  • Potential health and environmental impacts
  • Emission factors
  • Emission and control

Day Five: Pet Coke Properties and End Uses 

  • Pet Coke Quality
  • Process Economics
  • Hydro Treating Atmospheric Residue
  • Use Of Fuel Grade Coke for Power Generation
  • Feedstock Effects
  • Contaminants
  • Fuel Grade Coke
  • Anode Grade Pet Coke
  • Needle Grade Pet Coke

التذاكر

تم إغلاق التسجيلات
الوقت والتاريخ
الأحد، 27 أكتوبر 2024
البداية - 10:00 ص (Asia/Kuwait)
الخميس، 31 أكتوبر 2024
النهاية - 10:00 ص (Asia/Kuwait)

إضافة إلى التقويم

الموقع

Istanbul

Istanbul
تركيا
--Istanbul--

احصل على الاتجاه

منظِّم

Seattle International For Training

info@seattle-int.com
مشاركة

تعرف على آراء الجمهور عن هذه الفعالية، ثم انضم إلى المحادثة.