Best Practices in Surface Production Operations Management
التذاكر
تم إغلاق التسجيلات
Best Practices in Surface Production Operations Management
Best Practices in Surface Production Operations Management
20 -
24
أكتوبر
2024
Barcelona,
إسبانيا
What are the Goals?
The goal of this course will focus on the following objectives:
- Understand the challenges associated with production operations management
- Highlight best practice in metering, deferment administration and planning
- Generate strategy to meet the business-driver in an asset using case study
- Provide appropriate improvement process
By the end of this training course, you will learn to:
- Manage an operating asset with best-in-class practice initiative
- Understand the best management approach peculiar to your asset
- Recognize what to watch for in production operations practice
- Develop asset-specific integrated production plan
- Develop asset specific metering and deferment framework
Who is this Training Course for?
This training course is suitable to a wide range of professionals but will greatly benefit:
- Production Operators
- Field Production Personnel / Supervisors / Superintendents
- Production Engineers
- Asset Managers and Senior Managers
- Asset Support Engineers
- Process Engineers
- Reservoir Engineers
- Planning Engineers
- Production Accountants/Engineers
Daily Agenda
Day One: Overview of Surface Production Operations
- Introduction to Surface Production Operations
- Tools Supporting Operations Management
- Overview of Well, Reservoir & Facility Management (WRFM) process
- Metering Systems
- Operations Integration
Day Two: Production Deferment Administration
- General Principles of Deferment Administration
- Measurements
- Deferment Coding
- Roles & Responsibilities
- HCA Applications
Day Three: Production Allocation & Reconciliation
- Principles of Production Allocation & Reconciliation
- Domain Experts & Required Technology
- Populating and verification/validating process of data
- Allocation & Reconciliation
- Standard HCA Business Workflow
Day Four: Integrated Production/Injection Planning
- General Principles of Activity Planning
- Overview of Water-Injection System
- Business Objective for Integrated Production Planning
- Common Tools Required
- Challenges in Integrated Production Plan
- Integrated Production Plan Workflow
- Strategy in Generating Robust Plan linked to the Business
Day Five: Performance Review
- Case Study
- General Course Review
- Assessment of Participants
- Feedback
- Closing Remarks
التذاكر
تم إغلاق التسجيلات
دورات ذات صلة
Process Flare Fundamentals
05 -
06
يناير
2025
Cairo,
مصر
Security Risk Assessment and Management
02 -
06
فبراير
2025
Cairo,
مصر
Security Risk Assessment and Management
02 -
06
فبراير
2025
Cairo,
مصر
Surface Equipment Facilities
02 -
06
فبراير
2025
Istanbul,
تركيا
LNG Technologies & Production
02 -
06
فبراير
2025
Madrid,
إسبانيا
Loading Master for Oil, LNG, Gas & Petrochemical Terminals
02 -
06
فبراير
2025
Istanbul,
تركيا
Logistics of Crude Oil & Petroleum Products
02 -
06
فبراير
2025
Kuala Lumpur,
ماليزيا
SIPROD for Offshore Platforms (Simultaneous Drilling and Production)
02 -
06
فبراير
2025
Barcelona,
إسبانيا
Stimulation Technologies
02 -
06
فبراير
2025
London,
المملكة المتحدة
Stuck Pipe Prevention & Fishing Operations
02 -
06
فبراير
2025
Kuala Lumpur,
ماليزيا