Refinery Shutdown & Turnaround
التذاكر
تم إغلاق التسجيلات
Refinery Shutdown & Turnaround
Refinery Shutdown & Turnaround
18 -
23
أغسطس
2024
London,
المملكة المتحدة
What are the Goals?
At the end of this Refinery Shutdown & Turnaround training course, you will learn to:
- Understand the Failure mechanisms of the Refinery applying API 571
- Size the necessary work for Assets life maximization using API 579
- Apply the correct type of turnaround for each asset
- Schedule work activities
- Control time, budget and scope during the shutdown
- Assess the performance of the Turnaround
Who is this Training Course for?
It is highly recommended that Refinery maintenance, reliability, engineering and technical support staff including leadership and management to attend this Maintenance Engineering training course. Also, including:
- Planners
- Supervisors
- Engineers
- Reliability Engineers
- Maintenance Team Leaders and Managers
- Operations Team Leaders and Managers
Daily Agenda
Day One: Refinery Shutdown Types & Asset Pairing
- Definitions of Shutdown, Turnaround
- Material failure and degradation in Refinery using API 579
- Refinery structure and units sensitivity to failure
- Failure rate mathematics the basis of Reliability center maintenance
- Shutdown and the life cycle of Refineries
Day Two: Shutdown & Turnaround Planning
- Refinery Work Order system (WO) input for Planning
- Size of work using API 579 and create Work Breakdown Structure (WBs)
- Creating the most appropriate organization structure to run the shutdown
- Spare parts and materials required for the shutdown
- Personnel internal or subcontractors required for shutdown
Day Three: Organizing the Shutdown Time Sequencing
- Work sequencing optimization
- Material –personnel- contractors’ constraints
- Fitting the optimum number of shutdowns in the life cycle of Plants
- Utilization of timing techniques (CPM-PERT)
Day Four: Control of Shutdown Time, Costs & Work Quality
- Gantt charts for keeping in time
- S- curve usage for budget monitoring
- Financial reserves for uncertainties
- ISO/API standards for work handover
Day Five: Shutdown Performance Analysis & Turnaround Efficiency Measurement
- Asset Turnaround Performance Indicators
- Shutdown Workload Performance Indicators
- Shutdown Planning Performance Indicators
- Turnaround Effectiveness and cost Performance Indicators
- Shutdown and Turnaround data archiving and future recommendations
التذاكر
تم إغلاق التسجيلات
دورات ذات صلة
Operational Inspection and Maintenance
03 -
07
نوفمبر
2024
Cairo,
مصر
Asset Integrity Management in Oil & Gas Industries
03 -
07
نوفمبر
2024
London,
المملكة المتحدة
Mechanical Engineering Essentials
03 -
07
نوفمبر
2024
Swaziland,
سويسرا
Safety Audit & Site Inspection
03 -
07
نوفمبر
2024
Cairo,
مصر
Sustainable Facilities Management in the Oil and Gas Industry
03 -
07
نوفمبر
2024
London,
المملكة المتحدة
Amine Gas Sweetening & Sulphur Recovery
03 -
07
نوفمبر
2024
Madrid,
إسبانيا
Understanding LNG Terminals & Terminal Operations
03 -
07
نوفمبر
2024
London,
المملكة المتحدة
Asset Integrity Management in Oil & Gas Industries
03 -
07
نوفمبر
2024
Kuala Lumpur,
ماليزيا
Process Burner Fundamentals
03 -
07
نوفمبر
2024
Barcelona,
إسبانيا
Process Engineering Essentials
03 -
07
نوفمبر
2024
London,
المملكة المتحدة