What are the Goals?

By the end of this training course, participants will:

  • Familiarise all quality management techniques and procedures
  • Learn available non-destructive testing for concrete and steel structure projects
  • Understand the practical tools to control the concrete and the whole project that includes field-testing and the required laboratory facilities
  • Familiarise various techniques for evaluating the structures under construction
  • Learn modern field measurements such as concrete strength
  • Familiarise with all quality control techniques in hot climate

Who is this Training Course for?

This training course on Construction Quality Control on Site is also beneficial for:

  • Construction Engineers
  • Project Managers
  • Construction Managers
  • Quality Assurance and Quality Control professionals

Daily Agenda

Day One: Introduction Total Quality Management (TQM) of Concrete

  • Total quality management system
  • Quality assurance & Quality control
  • Who will perform the quality control?
  • Quality management constrain in oil and gas projects
  • Pareto chart
  • How to control the concrete from ready mix plant
  • How to control concrete casting onsite
  • Coefficient of variation
  • Auditing the construction site quality
  • Precaution in design mix in hot Weather

Day Two: Components of Concrete Material

  • Codes recommendation for the quality control
  • Codes and specifications limitations as ACI and EN
  • Comparison on different non-destructive testing
  • The Nature of Concrete Variability
  • Preparation before concreting
  • Concrete materials properties such as Aggregate and Cement
  • Check the corrosion in steel bars
  • Example of QC of concrete foundations construction under vibrating machine

Day Three: Properties of Fresh Concrete

  • Basic statistics
  • Collecting a data for evaluations
  • Statistics for the quality control data
  • Evaluating the grade of the quality
  • Concrete design mix
  • Precaution in design mix in hot climate for remote area
  • QC for fresh concrete
  • Quality control for concrete formwork
  • Pouring concrete in hot weather problems
  • Workability test for concrete
  • Cube and cylinder test
  • The replacement of the steel bars
  • The permissible deviation in erection steel structure
  • Applied load on the steel structure of pipe rack in construction activities

Day Four: Comparison between Different Non-destructive Tests

  • Comparison between Different Fresh Concrete Tests
  • Core test
  • Rebound hammer
  • Lok test
  • Load test for floor deck under machine
  • Ultrasonic test
  • Corrosion phenomena affect quality
  • Different corrosion protection system
  • QC for corrosion protection system for oil and gas plant
  • Applying QC on Wood formwork and steel
  • Steel reinforcing QC
  • Procedure of QC onsite
  • QA/QC Case study for foundation in gas plant

 Day Five: Integrity management

  • Materials used in welding steel structure
  • QC for Equipment preservation and installation for static equipment
  • QC for tank construction
  • QC for foundation construction and machine installation
  • The precaution in welding process
  • Anchor bolts QC
  • The reasons of welding defects
  • Overview of the 5 methods (PT,MP,RT,UT,VI)
  • Integrity management system for oil and gas plants

التذاكر

تم إغلاق التسجيلات
الوقت والتاريخ
الأحد، 8 ديسمبر 2024
البداية - 11:00 ص (Asia/Kuwait)
الخميس، 12 ديسمبر 2024
النهاية - 11:00 ص (Asia/Kuwait)

إضافة إلى التقويم

الموقع

Istanbul

Istanbul
تركيا
--Istanbul--

احصل على الاتجاه

منظِّم

Seattle International For Training

info@seattle-int.com
مشاركة

تعرف على آراء الجمهور عن هذه الفعالية، ثم انضم إلى المحادثة.